| RSS
ФЕСТИВАЛЬ "КАНТЕЛЕ". ПЕТРОЗАВОДСК

Главная » Construction news - Форум Воскресенье
20.08.2017
08:55
[ Новые сообщения · Участники · Правила форума · Поиск · RSS ]
Страница 1 из 11
Форум » Электронная конференция » Традиционные музыкальные инструменты » Construction news
Construction news
ByncchainiaДата: Воскресенье, 26.01.2014, 06:20 | Сообщение # 1
Группа: Пользователи
Сообщений: 5
Статус: Offline
The largest uncertainties in estimating GHG emissions from buildings come from the differences between design assumptions and actual building use and energy use intensity/performance. These could easily be on the order of a factor of 2 if they differ too much. For existing buildings, making http://samosval.netau.net retrofit or operational decisions, those uncertainties are far smaller and then the accuracy of the calculation of GHG emissions from electricity production probably contains the next highest source of uncertainty, although I have no data to support that assertion.The time- and weather-dependent performance of the electric grid and of buildings requires an incredible amount of intensive manipulation of available data, some of which is of poor accuracy and low reliability. Matching historical data to the weather and time when the electricity was generate is non-trivial.

http://excavations.comze.com
 
Форум » Электронная конференция » Традиционные музыкальные инструменты » Construction news
Страница 1 из 11
Поиск:

Copyright MyCorp © 2017 Бесплатный конструктор сайтов - uCoz